[ 
https://issues.apache.org/jira/browse/FLINK-13250?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Flink Jira Bot updated FLINK-13250:
-----------------------------------
    Labels: stale-assigned  (was: )

> Blink Planner should assign concrete resources to all nodes
> -----------------------------------------------------------
>
>                 Key: FLINK-13250
>                 URL: https://issues.apache.org/jira/browse/FLINK-13250
>             Project: Flink
>          Issue Type: Bug
>          Components: Table SQL / Planner
>            Reporter: Stephan Ewen
>            Assignee: Stephan Ewen
>            Priority: Major
>              Labels: stale-assigned
>
> Currently some nodes retain a resource spec of "DEFAULT"/ "UNKNOWN" as the 
> result of merging the pre-existing "DEFAULT" with the actual profile.



--
This message was sent by Atlassian Jira
(v8.3.4#803005)

Reply via email to