[ 
https://issues.apache.org/jira/browse/FLINK-18033?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Flink Jira Bot updated FLINK-18033:
-----------------------------------
    Labels: stale-major  (was: )

> Improve e2e test execution time
> -------------------------------
>
>                 Key: FLINK-18033
>                 URL: https://issues.apache.org/jira/browse/FLINK-18033
>             Project: Flink
>          Issue Type: Improvement
>          Components: Build System / Azure Pipelines, Test Infrastructure, 
> Tests
>            Reporter: Chesnay Schepler
>            Priority: Major
>              Labels: stale-major
>
> Running all e2e tests currently requires ~3.5h, and this time is growing.
> We should look into ways to bring this time down to improve feedback times.



--
This message was sent by Atlassian Jira
(v8.3.4#803005)

Reply via email to