[
https://issues.apache.org/jira/browse/FLINK-18033?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Flink Jira Bot updated FLINK-18033:
-----------------------------------
Labels: stale-major (was: )
> Improve e2e test execution time
> -------------------------------
>
> Key: FLINK-18033
> URL: https://issues.apache.org/jira/browse/FLINK-18033
> Project: Flink
> Issue Type: Improvement
> Components: Build System / Azure Pipelines, Test Infrastructure,
> Tests
> Reporter: Chesnay Schepler
> Priority: Major
> Labels: stale-major
>
> Running all e2e tests currently requires ~3.5h, and this time is growing.
> We should look into ways to bring this time down to improve feedback times.
--
This message was sent by Atlassian Jira
(v8.3.4#803005)