[ 
https://issues.apache.org/jira/browse/FLINK-16165?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Flink Jira Bot updated FLINK-16165:
-----------------------------------
    Labels: stale-critical  (was: )

> NestedLoopJoin fallback to HashJoin when build records number is very large
> ---------------------------------------------------------------------------
>
>                 Key: FLINK-16165
>                 URL: https://issues.apache.org/jira/browse/FLINK-16165
>             Project: Flink
>          Issue Type: Improvement
>          Components: Table SQL / Planner
>            Reporter: Jingsong Lee
>            Priority: Critical
>              Labels: stale-critical
>
> Now, if the statistic is not so accurate, maybe choose wrong join type to 
> nested loop join.
> If build records number is very large, this lead to very slow join, the user 
> looks like the join is in Hang.
> It is a stability problem, We should fallback to hash join in runtime to 
> avoid this hang.



--
This message was sent by Atlassian Jira
(v8.3.4#803005)

Reply via email to