[ 
https://issues.apache.org/jira/browse/FLINK-6453?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Konstantin Knauf updated FLINK-6453:
------------------------------------
    Labels:   (was: stale-major)

Removed "stale-critical|major|minor" label in line with 
https://issues.apache.org/jira/browse/FLINK-22429. 

> Web UI metrics charts should update only when a new data point is available
> ---------------------------------------------------------------------------
>
>                 Key: FLINK-6453
>                 URL: https://issues.apache.org/jira/browse/FLINK-6453
>             Project: Flink
>          Issue Type: Sub-task
>          Components: Runtime / Web Frontend
>            Reporter: Stephan Ewen
>            Priority: Major
>
> Metrics are pulled by the web server every 10 seconds by default.
> The metric charts update more frequently and pull new events.
> The charts assume that these are new data points, when in fact, they are 
> mostly not. Drawing the same datapoint again to a different time makes all 
> charts look stepwise, which is misleading:
> There are some cases where metrics in fact increase stepwise (for example num 
> events in bursty event channels) and currently there is no way to tell the 
> difference.
> A way around that would be to plot data points only if there are new data 
> points. Identifying new data points can be done via attaching sequence 
> numbers in the metrics handlers (incremented whenever the metrics are 
> re-requested from TMs). The chart can ignore data points with the same 
> sequence number.



--
This message was sent by Atlassian Jira
(v8.3.4#803005)

Reply via email to