[
https://issues.apache.org/jira/browse/FLINK-25036?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Zhu Zhu reassigned FLINK-25036:
-------------------------------
Assignee: Lijie Wang
> Introduce stage-wised scheduling strategy
> -----------------------------------------
>
> Key: FLINK-25036
> URL: https://issues.apache.org/jira/browse/FLINK-25036
> Project: Flink
> Issue Type: Sub-task
> Components: Runtime / Coordination
> Reporter: Lijie Wang
> Assignee: Lijie Wang
> Priority: Major
>
> The scheduling of the adaptive batch job scheduler should be stage
> granularity, because the information for deciding parallelism can only be
> collected after the upstream stage is fully finished, so we need to introduce
> a new scheduling strategy: Stage-wised Scheduling Strategy.
--
This message was sent by Atlassian Jira
(v8.20.1#820001)