[ 
https://issues.apache.org/jira/browse/FLINK-4323?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Stephan Ewen resolved FLINK-4323.
---------------------------------
    Resolution: Invalid

Shutdown hook is only installed in "standalone" mode, which in the 
high-availability context means "non high-availability" mode

> Checkpoint Coordinator Removes HA Checkpoints in Shutdown
> ---------------------------------------------------------
>
>                 Key: FLINK-4323
>                 URL: https://issues.apache.org/jira/browse/FLINK-4323
>             Project: Flink
>          Issue Type: Bug
>          Components: State Backends, Checkpointing
>    Affects Versions: 1.1.0
>            Reporter: Stephan Ewen
>            Priority: Blocker
>             Fix For: 1.2.0, 1.1.1
>
>
> The {{CheckpointCoordinator}} has a shutdown hook that "shuts down" the 
> savepoint store, rather than suspending it.
> As a consequence, HA checkpoints may be lost when the JobManager process 
> fails but allows the shutdown hook to run.
> I would suggest to remove the sutdown hook from the CheckpointCoordinator all 
> together. The JobManager process is responsible for cleanups and can better 
> decide what should be cleaned up and what not.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to