[ 
https://issues.apache.org/jira/browse/FLINK-4688?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Flink Jira Bot updated FLINK-4688:
----------------------------------
      Labels: auto-deprioritized-major auto-deprioritized-minor  (was: 
auto-deprioritized-major stale-minor)
    Priority: Not a Priority  (was: Minor)

This issue was labeled "stale-minor" 7 days ago and has not received any 
updates so it is being deprioritized. If this ticket is actually Minor, please 
raise the priority and ask a committer to assign you the issue or revive the 
public discussion.


> Optimizer hangs for hours when optimizing complex plans
> -------------------------------------------------------
>
>                 Key: FLINK-4688
>                 URL: https://issues.apache.org/jira/browse/FLINK-4688
>             Project: Flink
>          Issue Type: Bug
>          Components: API / DataSet
>    Affects Versions: 1.1.3, 1.2.0
>            Reporter: Fabian Hueske
>            Priority: Not a Priority
>              Labels: auto-deprioritized-major, auto-deprioritized-minor
>         Attachments: stacktrace_32minsAfterSubmission.java, 
> stacktrace_76minsAfterSubmission.java, stacktrace_shortlyAfterSubmission.java
>
>
> When optimizing a plan with many operators (more than 250), the optimizer 
> gets stuck for hours.
> A user reported this problem on the [email protected] list [1] and provided 
> stacktraces taken at different points in time (shortly after submission, 32 
> minutes and 76 minutes after submission) (see attachments).
> The stacktraces show deeply recursive {{hasDamOnPathDownTo()}} calls. Maybe 
> it is possible to improve the performance by caching the results?
> [1] 
> http://apache-flink-user-mailing-list-archive.2336050.n4.nabble.com/Complex-batch-workflow-needs-too-much-time-to-create-executionPlan-tp8596.html



--
This message was sent by Atlassian Jira
(v8.20.1#820001)

Reply via email to