[
https://issues.apache.org/jira/browse/FLINK-26517?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Zhu Zhu reassigned FLINK-26517:
-------------------------------
Assignee: Lijie Wang
> Normalize the decided parallelism to power of 2 when using adaptive batch
> scheduler
> -----------------------------------------------------------------------------------
>
> Key: FLINK-26517
> URL: https://issues.apache.org/jira/browse/FLINK-26517
> Project: Flink
> Issue Type: Bug
> Components: Runtime / Coordination
> Reporter: Lijie Wang
> Assignee: Lijie Wang
> Priority: Blocker
> Fix For: 1.15.0
>
>
> As describe in FLINK-26330, in order to make the number of subpartitoins
> evenly consumed by downstream tasks, we need to normalize the decided
> parallelism to 2^N.
--
This message was sent by Atlassian Jira
(v8.20.1#820001)