[
https://issues.apache.org/jira/browse/FLINK-27281?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=17523596#comment-17523596
]
Yang Wang commented on FLINK-27281:
-----------------------------------
This might be related with FLINK-27257 if we choose to improve the
{{isJobRunning}} implementation.
> Improve stability conditions for rollback logic
> -----------------------------------------------
>
> Key: FLINK-27281
> URL: https://issues.apache.org/jira/browse/FLINK-27281
> Project: Flink
> Issue Type: Improvement
> Components: Kubernetes Operator
> Reporter: Gyula Fora
> Priority: Major
> Fix For: kubernetes-operator-1.0.0
>
>
> This is a follow up to https://issues.apache.org/jira/browse/FLINK-26140
> We should allow more configurable / sophisticated stability conditions for
> the rollback behaviour.
> 2 things that come to mind:
> - Somehow detect that the job was running without failures before it is
> considered stable
> - Require one completed checkpoint (optional, depending on the checkpoint
> period etc)
--
This message was sent by Atlassian Jira
(v8.20.1#820001)