[
https://issues.apache.org/jira/browse/FLINK-27793?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
jinshuangxian updated FLINK-27793:
----------------------------------
Attachment: image-2022-05-26-20-43-49-784.png
> After upgrading to flink-1.15.0, flink jobmanager cannot shutdown
> -----------------------------------------------------------------
>
> Key: FLINK-27793
> URL: https://issues.apache.org/jira/browse/FLINK-27793
> Project: Flink
> Issue Type: Bug
> Environment: Flink 1.15.0
> Hadoop 2.7.3.2.6.5.0-292
> Start the task with yarn per job
> Reporter: jinshuangxian
> Priority: Major
> Fix For: 1.15.0
>
> Attachments: image-2022-05-26-20-43-49-784.png
>
>
> Under normal circumstances, after the taskmanager fails, it will retry
> multiple times. After reaching the number of failures, the task will exit.
> After upgrading to flink-1.15.0, the test found that when the taskmanager was
> abnormal, the job was completed, but the task jobmanager was still running
> normally, and the yarn application -list commmand found that the task was
> still running.
--
This message was sent by Atlassian Jira
(v8.20.7#820007)