[
https://issues.apache.org/jira/browse/FLINK-27820?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
ASF GitHub Bot updated FLINK-27820:
-----------------------------------
Labels: pull-request-available (was: )
> Handle Upgrade/Deployment errors gracefully
> -------------------------------------------
>
> Key: FLINK-27820
> URL: https://issues.apache.org/jira/browse/FLINK-27820
> Project: Flink
> Issue Type: Improvement
> Components: Kubernetes Operator
> Affects Versions: kubernetes-operator-1.0.0
> Reporter: Gyula Fora
> Assignee: Gyula Fora
> Priority: Major
> Labels: pull-request-available
> Fix For: kubernetes-operator-1.1.0
>
>
> The operator currently cannot gracefully handle the cases when there is a
> failure during (or directly after & and before updating the status) job
> submission.
> This applies to both initial cluster submissions when a Flink CR was created
> but more importantly during upgrades.
> This is slightly related to https://issues.apache.org/jira/browse/FLINK-27804
> where mid-upgrade observe was disabled to workaround some issues, this logic
> should also be improved to only skip observing last-state info for already
> finished jobs (that were observed before).
> During upgrades, the observer should be able to recognize when the
> job/cluster was actually submitted already even if the status update
> subsequently failed and move the status into a healthy DEPLOYED state.
--
This message was sent by Atlassian Jira
(v8.20.7#820007)