[ 
https://issues.apache.org/jira/browse/FLINK-27820?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

ASF GitHub Bot updated FLINK-27820:
-----------------------------------
    Labels: pull-request-available  (was: )

> Handle Upgrade/Deployment errors gracefully
> -------------------------------------------
>
>                 Key: FLINK-27820
>                 URL: https://issues.apache.org/jira/browse/FLINK-27820
>             Project: Flink
>          Issue Type: Improvement
>          Components: Kubernetes Operator
>    Affects Versions: kubernetes-operator-1.0.0
>            Reporter: Gyula Fora
>            Assignee: Gyula Fora
>            Priority: Major
>              Labels: pull-request-available
>             Fix For: kubernetes-operator-1.1.0
>
>
> The operator currently cannot gracefully handle the cases when there is a 
> failure during (or directly after & and before updating the status) job 
> submission.
> This applies to both initial cluster submissions when a Flink CR was created 
> but more importantly during upgrades.
> This is slightly related to https://issues.apache.org/jira/browse/FLINK-27804 
> where mid-upgrade observe was disabled to workaround some issues, this logic 
> should also be improved to only skip observing last-state info for already 
> finished jobs (that were observed before).
> During upgrades, the observer should be able to recognize when the 
> job/cluster was actually submitted already even if the status update 
> subsequently failed and move the status into a healthy DEPLOYED state.



--
This message was sent by Atlassian Jira
(v8.20.7#820007)

Reply via email to