[
https://issues.apache.org/jira/browse/FLINK-28134?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Zhu Zhu closed FLINK-28134.
---------------------------
Resolution: Done
Done via
b96d476d4cd05de1e6c0b001f2477aaed98bd473
e73225e4071fb7ffe7c4d5cbfd89983129fe3312
67aeb8165c623e35f773de7e50d0f00c24cca539
> Introduce SpeculativeExecutionVertex
> ------------------------------------
>
> Key: FLINK-28134
> URL: https://issues.apache.org/jira/browse/FLINK-28134
> Project: Flink
> Issue Type: Sub-task
> Components: Runtime / Coordination
> Reporter: Zhu Zhu
> Assignee: Zhu Zhu
> Priority: Major
> Labels: pull-request-available
> Fix For: 1.16.0
>
>
> SpeculativeExecutionVertex will be used if speculative execution is enabled,
> as a replacement of ExecutionVertex to form an ExecutionGraph. The core
> difference is that a SpeculativeExecutionVertex can have multiple current
> executions running at the same time.
--
This message was sent by Atlassian Jira
(v8.20.10#820010)