[
https://issues.apache.org/jira/browse/FLINK-28612?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Zhu Zhu reassigned FLINK-28612:
-------------------------------
Assignee: Zhu Zhu
> Cancel pending slot allocation after canceling executions
> ---------------------------------------------------------
>
> Key: FLINK-28612
> URL: https://issues.apache.org/jira/browse/FLINK-28612
> Project: Flink
> Issue Type: Sub-task
> Components: Runtime / Coordination
> Reporter: Zhu Zhu
> Assignee: Zhu Zhu
> Priority: Major
> Fix For: 1.16.0
>
>
> Canceling pending slot allocation before canceling executions will result in
> execution failures and pollute the logs. It will also result in an execution
> to be FAILED even if the execution vertex has FINISHED, which breaks the
> assumption of SpeculativeScheduler#isExecutionVertexPossibleToFinish().
--
This message was sent by Atlassian Jira
(v8.20.10#820010)