[ 
https://issues.apache.org/jira/browse/FLINK-30528?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

ASF GitHub Bot updated FLINK-30528:
-----------------------------------
    Labels: pull-request-available  (was: )

> Job may be stuck in upgrade loop when last-state fallback is disabled and 
> deployment is missing
> -----------------------------------------------------------------------------------------------
>
>                 Key: FLINK-30528
>                 URL: https://issues.apache.org/jira/browse/FLINK-30528
>             Project: Flink
>          Issue Type: Bug
>          Components: Kubernetes Operator
>    Affects Versions: kubernetes-operator-1.3.0
>            Reporter: Gyula Fora
>            Assignee: Gyula Fora
>            Priority: Major
>              Labels: pull-request-available
>
> When last-state upgrade fallback is disabled (or we are switching flink 
> versions) and the JM deployment is missing for some reason, we get stuck in 
> the upgrade loop as the spec change /upgrade logic always takes precedence 
> over the JM deployment recovery logic.
> In this cases the JM deployment need to be recovered first so savepoint 
> upgrade can be executed.



--
This message was sent by Atlassian Jira
(v8.20.10#820010)

Reply via email to