[ 
https://issues.apache.org/jira/browse/FLINK-30604?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Lijie Wang updated FLINK-30604:
-------------------------------
    Summary: Remove the limitation that parallelism decided by adaptive batch 
scheduler must be power-of-two  (was: Remove the limitation of that parallelism 
decided by adaptive batch scheduler must be power-of-two)

> Remove the limitation that parallelism decided by adaptive batch scheduler 
> must be power-of-two
> -----------------------------------------------------------------------------------------------
>
>                 Key: FLINK-30604
>                 URL: https://issues.apache.org/jira/browse/FLINK-30604
>             Project: Flink
>          Issue Type: Sub-task
>          Components: Runtime / Coordination
>            Reporter: Lijie Wang
>            Assignee: Lijie Wang
>            Priority: Major
>             Fix For: 1.17.0
>
>
> In FLINK-26517, we add a limitation that the parallelism decided by adaptive 
> batch scheduler must be 2^N(for the subpartitions can evenly distribute to 
> downstream tasks). After FLINK-29666, we can evenly distribute data to 
> downstream tasks, so we can remove the limitation



--
This message was sent by Atlassian Jira
(v8.20.10#820010)

Reply via email to