[
https://issues.apache.org/jira/browse/FLINK-33228?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Yangze Guo reassigned FLINK-33228:
----------------------------------
Assignee: xiangyu feng
> Fix the total current resource calculation when fulfilling requirements
> -----------------------------------------------------------------------
>
> Key: FLINK-33228
> URL: https://issues.apache.org/jira/browse/FLINK-33228
> Project: Flink
> Issue Type: Bug
> Components: Runtime / Coordination
> Reporter: xiangyu feng
> Assignee: xiangyu feng
> Priority: Major
> Labels: pull-request-available
> Attachments: image-2023-10-10-16-09-23-635.png
>
>
> Currently, the `totalCurrentResources` calculation in
> `DefaultResourceAllocationStrategy#tryFulfillRequirements` is wrong.
> `ResourceProfile.merge` will not change the original `ResourceProfile`.
> !image-2023-10-10-16-09-23-635.png|width=564,height=286!
--
This message was sent by Atlassian Jira
(v8.20.10#820010)