[
https://issues.apache.org/jira/browse/FLINK-33276?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Matthias Pohl resolved FLINK-33276.
-----------------------------------
Fix Version/s: 1.19.0
1.18.1
Resolution: Fixed
> Reorganize CI stages
> --------------------
>
> Key: FLINK-33276
> URL: https://issues.apache.org/jira/browse/FLINK-33276
> Project: Flink
> Issue Type: Technical Debt
> Components: Build System / CI
> Affects Versions: 1.18.0, 1.19.0
> Reporter: Matthias Pohl
> Assignee: Matthias Pohl
> Priority: Major
> Labels: pull-request-available
> Fix For: 1.19.0, 1.18.1
>
>
> {{connect_2}} stage became obsolete due to the externalization of the
> connectors. We can merge {{connect_1}} and {{connect_2}} again into a single
> {{connect}} stage (and maybe rename it into something more meaningful?)
--
This message was sent by Atlassian Jira
(v8.20.10#820010)