[
https://issues.apache.org/jira/browse/FLINK-34947?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Gyula Fora updated FLINK-34947:
-------------------------------
Summary: Reduce JM scale down timeout (was: Do not scale down JM in Orphan
deletion propagation and reduce timeout)
> Reduce JM scale down timeout
> ----------------------------
>
> Key: FLINK-34947
> URL: https://issues.apache.org/jira/browse/FLINK-34947
> Project: Flink
> Issue Type: Improvement
> Components: Kubernetes Operator
> Affects Versions: kubernetes-operator-1.8.0
> Reporter: Gyula Fora
> Assignee: Gyula Fora
> Priority: Major
> Fix For: kubernetes-operator-1.9.0
>
>
> We introduced a logic to scale down the JobManager before the task managers
> are killed to have a more graceful shutdown sequence.
> Currently this is always done in native mode, but it does not make sense
> during orphan deletion propagation when the intention is to delete the
> FlinkDeployment but not the underlying resources.
> Furthermore instead of using the entire deletion timeout we should reduce
> this to only use a portion of it as it's an optional step and we should
> always have keep enough time for the TM shutdown.
--
This message was sent by Atlassian Jira
(v8.20.10#820010)