Xintong Song updated FLINK-36168:
---------------------------------
Fix Version/s: (was: 2.0.0)
> AdaptiveSchedulerTest doesn't follow the production lifecycle
> -------------------------------------------------------------
>
> Key: FLINK-36168
> URL: https://issues.apache.org/jira/browse/FLINK-36168
> Project: Flink
> Issue Type: Sub-task
> Reporter: Matthias Pohl
> Assignee: Zdenek Tison
> Priority: Major
> Labels: pull-request-available
> Fix For: 2.0-preview
>
>
> The {{AdaptiveSchedulerTest}} doesn't follow the production lifecycle
> properly: The executor representing the main thread is shutting down before
> the AdaptiveScheduler is closed (or more precisely, the scheduler isn't
> closed at all in most of the tests).
> This can cause issues when shutting down the executor and tasks still being
> scheduled and not properly cleaned up. This issue is about fixing the test in
> this regards.
--