[
https://issues.apache.org/jira/browse/FLINK-35549?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Matthias Pohl updated FLINK-35549:
----------------------------------
Release Note: FLIP-461 enables the user to synchronize checkpointing and
rescaling in the AdaptiveScheduler. New configuration parameters were
introduced for the maximum trigger delay and the number of acceptable failed
checkpoints before triggering a rescale to make this behavior configurable.
These parameters were updated in FLINK-36015. See the FLINK-36015 release notes
and Flink's configuration documentation for further details. (was: FLIP-461
enables the user to synchronize checkpointing and rescaling in the
AdaptiveScheduler. jobmanager.adaptive-scheduler.max-delay-for-scale-trigger
and jobmanager.adaptive-scheduler.scale-on-failed-checkpoints-count
configuration parameters were introduced to make this behavior configurable.
See Flink's configuration documentation for further details.)
> FLIP-461: Synchronize rescaling with checkpoint creation to minimize
> reprocessing for the AdaptiveScheduler
> -----------------------------------------------------------------------------------------------------------
>
> Key: FLINK-35549
> URL: https://issues.apache.org/jira/browse/FLINK-35549
> Project: Flink
> Issue Type: Improvement
> Components: Runtime / Checkpointing, Runtime / Coordination
> Affects Versions: 1.20.0
> Reporter: Matthias Pohl
> Assignee: Matthias Pohl
> Priority: Major
> Fix For: 2.0-preview
>
>
> This is the umbrella issue for implementing
> [FLIP-461|https://cwiki.apache.org/confluence/display/FLINK/FLIP-461%3A+Synchronize+rescaling+with+checkpoint+creation+to+minimize+reprocessing+for+the+AdaptiveScheduler]
--
This message was sent by Atlassian Jira
(v8.20.10#820010)