[
https://issues.apache.org/jira/browse/FLINK-37533?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
ASF GitHub Bot updated FLINK-37533:
-----------------------------------
Labels: pull-request-available (was: )
> Reduce Stale PR Action timeouts
> -------------------------------
>
> Key: FLINK-37533
> URL: https://issues.apache.org/jira/browse/FLINK-37533
> Project: Flink
> Issue Type: Improvement
> Reporter: Thomas Cooper
> Priority: Not a Priority
> Labels: pull-request-available
>
> [FLINK-37026|https://issues.apache.org/jira/browse/FLINK-37026] enabled the
> Stale PR GitHub Action and this has been running successfully for several
> months, [labelling PRs older than 6 months as
> "stale"|https://github.com/apache/flink/labels/stale].
> The initial time-outs for the Stale PR action were 6 months inactive with 3
> further months of no action before closing. This was done to give time for PR
> authors to react to the new action. However, during the
> [discussion|https://lists.apache.org/thread/6yoclzmvymxors8vlpt4nn9r7t3stcsz]
> it was suggested that 3 months inactive with 1 month to respond was the
> typical configuration used on other Apache projects and should also be used
> for Flink. It was decided to start with longer time-outs and move to the
> standard ones once the stability of the action was confirmed.
> Now that the action has been running for some time with no issues, we should
> reduce the time-outs to the proposed Apache standard configuration. This will
> allow us to start clearing the oldest stale PRs.
--
This message was sent by Atlassian Jira
(v8.20.10#820010)