Alan Zhang created FLINK-37567:
----------------------------------
Summary: Flink clusters not be clean up when using job
cancellation as suspend mechanism
Key: FLINK-37567
URL: https://issues.apache.org/jira/browse/FLINK-37567
Project: Flink
Issue Type: Improvement
Reporter: Alan Zhang
In general, for application mode, the Flink cluster lifecycle should be tight
with the Flink job lifecycle, which means we should delete the Flink cluster if
the job stopped.
However, I noticed that Flink clusters are not deleted when I tried to suspend
FlinkDeployment with "job-cancel" enabled. The CR shows the job under
"CANCELED" state, but the underlying Flink cluster is still running.
--
This message was sent by Atlassian Jira
(v8.20.10#820010)