[ 
https://issues.apache.org/jira/browse/FLINK-30529?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Gyula Fora closed FLINK-30529.
------------------------------
      Assignee: Gyula Fora  (was: Zhenqiu Huang)
    Resolution: Fixed

> Use simple cancel for savepoint upgrades on failing jobs
> --------------------------------------------------------
>
>                 Key: FLINK-30529
>                 URL: https://issues.apache.org/jira/browse/FLINK-30529
>             Project: Flink
>          Issue Type: Improvement
>          Components: Kubernetes Operator
>            Reporter: Gyula Fora
>            Assignee: Gyula Fora
>            Priority: Major
>
> In some cases where savepoint upgrades are required we should consider simply 
> cancelling the job and observing the last checkpoint/savepoint available.
> We should think through what are the caveats of this approach but this could 
> help upgrade some clusters that would be stuck now.



--
This message was sent by Atlassian Jira
(v8.20.10#820010)

Reply via email to