[ 
https://issues.apache.org/jira/browse/FLINK-38403?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=18060058#comment-18060058
 ] 

Rui Fan commented on FLINK-38403:
---------------------------------

[https://dev.azure.com/apache-flink/apache-flink/_build/results?buildId=72555&view=logs&j=39d5b1d5-3b41-54dc-6458-1e2ddd1cdcf3&t=115e5c38-6efb-5006-4921-5e2851da71ef&l=42415]

 

It is caused by *Could not acquire the minimum required resources.*

The TM was crashed since NPE happens during cleanup. We need to investigate 
whether `this.state == null` should be tolerated.

!image-2026-02-21-17-46-36-643.png|width=1391,height=628!

 

> UnalignedCheckpointITCase failed in test_cron_hadoop313 tests
> -------------------------------------------------------------
>
>                 Key: FLINK-38403
>                 URL: https://issues.apache.org/jira/browse/FLINK-38403
>             Project: Flink
>          Issue Type: Bug
>          Components: Tests
>    Affects Versions: 2.2.0
>            Reporter: Ruan Hang
>            Assignee: Arvid Heise
>            Priority: Major
>              Labels: pull-request-available
>             Fix For: 2.3.0
>
>         Attachments: image-2026-02-21-17-46-36-643.png
>
>
> Details:
> https://dev.azure.com/apache-flink/apache-flink/_build/results?buildId=69810&view=logs&j=baf26b34-3c6a-54e8-f93f-cf269b32f802&t=b380e762-00fc-5c06-e76c-b8e53634ca34



--
This message was sent by Atlassian Jira
(v8.20.10#820010)

Reply via email to