https://issues.apache.org/jira/browse/FLINK-39743?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=18084683#comment-18084683
 ] 

Dennis-Mircea Ciupitu commented on FLINK-39743:
-----------------------------------------------

Thank you for opening this bug, [~devikasudheer23]! I confirm this is a bug, 
the analysis is right and the fix you proposed is the right shape. I'll 
document this as part of the FLINK-39571 for improving the overall operator 
documentation.

Do you want to tackle the implementation as a contribution?

> Incorrect Expected Processing Rate Computation
> ----------------------------------------------
>
>                 Key: FLINK-39743
>                 URL: https://issues.apache.org/jira/browse/FLINK-39743
>             Project: Flink
>          Issue Type: Bug
>          Components: Autoscaler, Kubernetes Operator
>    Affects Versions: kubernetes-operator-1.16.0
>            Reporter: Devika Sudheer
>            Priority: Minor
>
> h1. Overview
> The Flink Autoscaler computes the expected processing rate 
> (EXPECTED_PROCESSING_RATE) using cappedTargetCapacity, which is derived from 
> the initial scaling factor proposed by the algorithm after bounding it within 
> MAX_SCALE_DOWN_FACTOR and MAX_SCALE_UP_FACTOR. 
> [https://github.com/apache/flink-kubernetes-operator/blame/main/flink-autoscaler/src/main/java/org/apache/flink/autoscaler/JobVertexScaler.java#L255]
>  
> However, the recommended parallelism can later be modified inside the scale() 
> method due to additional constraints such as max parallelism, vertex-level 
> min/max limits, and input partition counts. As a result, the final applied 
> scaling factor may differ from the factor originally used to compute 
> cappedTargetCapacity. This mismatch can cause effective scaling actions to be 
> incorrectly classified as ineffective.
> For example, consider a vertex with:
>  * Current parallelism = 100
>  * Current average true processing rate = 100 messages/sec
>  * Recommended scaling factor = 3
> Based on the initial scaling factor, the expected processing rate is computed 
> as 300 messages/sec. However, if the vertex max parallelism is 200, the final 
> recommended parallelism is capped at 200, meaning the effective scaling 
> factor becomes 2 instead of 3. In this case, the expected processing rate 
> should be 200 messages/sec, not 300 messages/sec.
> With an ineffective scale-out detection threshold of 10%, the minimum 
> expected improvement would incorrectly be evaluated against 300 messages/sec 
> (threshold = 120 messages/sec) rather than the actual capped expectation of 
> 200 messages/sec (threshold = 110 messages/sec). As a result, a valid 
> post-scale processing rate such as 115 messages/sec could still be 
> incorrectly treated as ineffective, causing subsequent scale-out actions to 
> be unnecessarily blocked.
> h1. Proposed Solution
> Compute the expected processing rate after the scale() method finalizes and 
> adjusts newParallelism based on constraints such as max parallelism, 
> vertex-level min/max limits, input partition counts, etc.
> {code:java}
> double cappedTargetCapacity = averageTrueProcessingRate * (newParallelism / 
> currentParallelism);
> evaluatedMetrics.put(ScalingMetric.EXPECTED_PROCESSING_RATE, 
> EvaluatedScalingMetric.of(cappedTargetCapacity)); {code}



--
This message was sent by Atlassian Jira
(v8.20.10#820010)

Reply via email to