[
https://issues.apache.org/jira/browse/GEODE-3212?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Fred Krone updated GEODE-3212:
------------------------------
Summary: Spike: How to migrate non persistent region to persistent region
without data loss (was: Spike: How to migrate non persistent region to
persistent region without data loss.)
> Spike: How to migrate non persistent region to persistent region without data
> loss
> ----------------------------------------------------------------------------------
>
> Key: GEODE-3212
> URL: https://issues.apache.org/jira/browse/GEODE-3212
> Project: Geode
> Issue Type: Task
> Components: persistence
> Reporter: Fred Krone
>
> Context
> After PCC releases with persistence support a customer would have an option
> to enable that with new regions. We need to understand how users can migrate
> old regions and change their type?
> Also, how can PCC switch on persistence with SSC region which is their
> internal region?
> Question:
> Assume I have a PCC version 1.1.x cluster with both an ssc and a non-ssc
> region. I want to upgrade to PCC 1.2 and persist both regions, what steps are
> necessary?
> Steps:
> manually migrate non-ssc
> manually migrate ssc
> manually migrate when there is non-persisted pdx? (this might change is we
> can gaurantee pdx has been persisted)
> capture all steps
> PCC is requesting one Storage engineer to pair for the day.
> This ticket may generate other tickets for Storage.
--
This message was sent by Atlassian JIRA
(v6.4.14#64029)