[
https://issues.apache.org/jira/browse/GEODE-4803?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16535143#comment-16535143
]
ASF subversion and git services commented on GEODE-4803:
--------------------------------------------------------
Commit 2ba81f6e78e49b515e9271695f160b42218988b8 in geode's branch
refs/heads/develop from jinmeiliao
[ https://gitbox.apache.org/repos/asf?p=geode.git;h=2ba81f6 ]
GEODE-4803: remove flaky category (#2108)
Co-authored-by: Finn Southerland <[email protected]>
> CI: ConcurrentDeployDUnitTest fails intermittently
> --------------------------------------------------
>
> Key: GEODE-4803
> URL: https://issues.apache.org/jira/browse/GEODE-4803
> Project: Geode
> Issue Type: Bug
> Components: gfsh
> Affects Versions: 1.5.0
> Reporter: Kenneth Howe
> Assignee: Jinmei Liao
> Priority: Major
> Labels: ci, pull-request-available, swat
> Attachments: Test results - Class
> org.apache.geode.management.internal.cli.commands.ConcurrentDeployDUnitTest.html
>
> Time Spent: 40m
> Remaining Estimate: 0h
>
> The test concurrently runs iterations of gfsh commands to deploy and undeploy
> .jar's from 3 gfsh clients to the same server, then waits up to 5 minutes for
> the gfsh clients to finish. Sometimes in the CI pipelines one or more of the
> clients don't complete their iterations within the 5 minute wait.
> Test timing and/or client iterations needs to be adjusted for variations in
> machine and network speed.
> Also see GEODE-800.
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)