[
https://issues.apache.org/jira/browse/GEODE-6203?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Dan Smith updated GEODE-6203:
-----------------------------
Summary: Include uncertainity values to analyzeRun results (was: Include
uncertainity values to anaylzeRun results)
> Include uncertainity values to analyzeRun results
> -------------------------------------------------
>
> Key: GEODE-6203
> URL: https://issues.apache.org/jira/browse/GEODE-6203
> Project: Geode
> Issue Type: Task
> Components: benchmarks
> Reporter: Dan Smith
> Priority: Major
>
> It's hard to tell from the results of analyzeRun whether differences between
> runs are statistically significant or not.
> As first cut, we should try to include a confidence interval with each of our
> measurements.
> We can use 3 * the standard error (99.7% confidence interval) for the
> throughput and mean latency measurements, and propagate the error to the
> ratio between two runs. That should give us a confidence interval for the
> ratio as well which will help us determine if the changes have a
> statistically significant difference.
> After making these changes, we should investigate to see if multiple runs on
> the same hardware remain within this confidence interval. This methodology
> may not work, since all of the measurements we take within a single run
> aren't really independent. If the multiple runs don't stay within the
> interval, we may need to consider running each benchmark multiple times like
> JMH to produce a more accurate error estimate.
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)