Darrel Schneider created GEODE-113:
--------------------------------------

             Summary: 
BridgeMembershipDUnitTest.testBridgeMembershipEventsInClient unit test takes 
too long to run
                 Key: GEODE-113
                 URL: https://issues.apache.org/jira/browse/GEODE-113
             Project: Geode
          Issue Type: Bug
            Reporter: Darrel Schneider
            Priority: Minor


I noticed the testBridgeMembershipEventsInClient method takes 3 minutes and 2 
seconds to run.
And it gets run twice (once for BridgeMembershipDUnitTest and once for 
BridgeMembershipSelectorDUnitTest).

The cause of it running so long are 3 one minute pauses and 1 two second pause.




--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to