[ 
https://issues.apache.org/jira/browse/HBASE-9199?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Jimmy Xiang updated HBASE-9199:
-------------------------------

      Resolution: Fixed
    Hadoop Flags: Reviewed
          Status: Resolved  (was: Patch Available)

Integrated into trunk and 0.95.  Thanks Stack for the review.
                
> Call duration is not accurate
> -----------------------------
>
>                 Key: HBASE-9199
>                 URL: https://issues.apache.org/jira/browse/HBASE-9199
>             Project: HBase
>          Issue Type: Bug
>            Reporter: Jimmy Xiang
>            Assignee: Jimmy Xiang
>            Priority: Minor
>             Fix For: 0.98.0, 0.95.2
>
>         Attachments: trunk-9199.patch
>
>
> In RpcRetryingCaller, when calculating the call duration, the endTime is not 
> updated yet, the current time should be used.

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators
For more information on JIRA, see: http://www.atlassian.com/software/jira

Reply via email to