[ 
https://issues.apache.org/jira/browse/HBASE-9199?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13739070#comment-13739070
 ] 

Hudson commented on HBASE-9199:
-------------------------------

SUCCESS: Integrated in hbase-0.95-on-hadoop2 #239 (See 
[https://builds.apache.org/job/hbase-0.95-on-hadoop2/239/])
HBASE-9199 Call duration is not accurate (jxiang: rev 1513585)
* 
/hbase/branches/0.95/hbase-client/src/main/java/org/apache/hadoop/hbase/client/RpcRetryingCaller.java

                
> Call duration is not accurate
> -----------------------------
>
>                 Key: HBASE-9199
>                 URL: https://issues.apache.org/jira/browse/HBASE-9199
>             Project: HBase
>          Issue Type: Bug
>            Reporter: Jimmy Xiang
>            Assignee: Jimmy Xiang
>            Priority: Minor
>             Fix For: 0.98.0, 0.95.2
>
>         Attachments: trunk-9199.patch
>
>
> In RpcRetryingCaller, when calculating the call duration, the endTime is not 
> updated yet, the current time should be used.

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators
For more information on JIRA, see: http://www.atlassian.com/software/jira

Reply via email to