[ 
https://issues.apache.org/jira/browse/HBASE-9420?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Ted Yu updated HBASE-9420:
--------------------------

    Status: Open  (was: Patch Available)

> Math.max() on syncedTillHere lacks synchronization
> --------------------------------------------------
>
>                 Key: HBASE-9420
>                 URL: https://issues.apache.org/jira/browse/HBASE-9420
>             Project: HBase
>          Issue Type: Bug
>            Reporter: Ted Yu
>            Assignee: Ted Yu
>            Priority: Trivial
>             Fix For: 0.98.0
>
>         Attachments: 9420-v1.txt, 9420-v2.txt
>
>
> In FSHlog#syncer(), around line 1080:
> {code}
>       this.syncedTillHere = Math.max(this.syncedTillHere, doneUpto);
> {code}
> Assignment to syncedTillHere after computing max value is not protected by 
> proper synchronization.



--
This message was sent by Atlassian JIRA
(v6.1#6144)

Reply via email to