[
https://issues.apache.org/jira/browse/HBASE-10101?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Jeffrey Zhong updated HBASE-10101:
----------------------------------
Attachment: hbase-10101-v3.patch
Ok, make sense. I moved the changes into the AM#processRegionsInTransition and
adjust the test case a little bit to make it more reliable. Thanks for the
comments.
> testOfflineRegionReAssginedAfterMasterRestart times out sometimes.
> ------------------------------------------------------------------
>
> Key: HBASE-10101
> URL: https://issues.apache.org/jira/browse/HBASE-10101
> Project: HBase
> Issue Type: Test
> Reporter: Jimmy Xiang
> Assignee: Jeffrey Zhong
> Priority: Minor
> Attachments: hbase-10101-v2.patch, hbase-10101-v3.patch,
> hbase-10101.patch, test.log
>
>
> Sometimes, I got this test timed out. The log is attached. It could be
> because the new cluster takes a while to process the dead server, or assign
> meta.
--
This message was sent by Atlassian JIRA
(v6.1.4#6159)