[ 
https://issues.apache.org/jira/browse/HBASE-10252?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13858826#comment-13858826
 ] 

Hadoop QA commented on HBASE-10252:
-----------------------------------

{color:red}-1 overall{color}.  Here are the results of testing the latest 
attachment 
  
http://issues.apache.org/jira/secure/attachment/12620838/HBASE-10252-trunk-v1.patch
  against trunk revision .
  ATTACHMENT ID: 12620838

    {color:green}+1 @author{color}.  The patch does not contain any @author 
tags.

    {color:green}+1 tests included{color}.  The patch appears to include 3 new 
or modified tests.

    {color:green}+1 hadoop1.0{color}.  The patch compiles against the hadoop 
1.0 profile.

    {color:green}+1 hadoop1.1{color}.  The patch compiles against the hadoop 
1.1 profile.

    {color:green}+1 javadoc{color}.  The javadoc tool did not generate any 
warning messages.

    {color:green}+1 javac{color}.  The applied patch does not increase the 
total number of javac compiler warnings.

    {color:green}+1 findbugs{color}.  The patch does not introduce any new 
Findbugs (version 1.3.9) warnings.

    {color:green}+1 release audit{color}.  The applied patch does not increase 
the total number of release audit warnings.

    {color:green}+1 lineLengths{color}.  The patch does not introduce lines 
longer than 100

    {color:red}-1 site{color}.  The patch appears to cause mvn site goal to 
fail.

    {color:green}+1 core tests{color}.  The patch passed unit tests in .

Test results: 
https://builds.apache.org/job/PreCommit-HBASE-Build/8303//testReport/
Findbugs warnings: 
https://builds.apache.org/job/PreCommit-HBASE-Build/8303//artifact/trunk/patchprocess/newPatchFindbugsWarningshbase-hadoop2-compat.html
Findbugs warnings: 
https://builds.apache.org/job/PreCommit-HBASE-Build/8303//artifact/trunk/patchprocess/newPatchFindbugsWarningshbase-prefix-tree.html
Findbugs warnings: 
https://builds.apache.org/job/PreCommit-HBASE-Build/8303//artifact/trunk/patchprocess/newPatchFindbugsWarningshbase-client.html
Findbugs warnings: 
https://builds.apache.org/job/PreCommit-HBASE-Build/8303//artifact/trunk/patchprocess/newPatchFindbugsWarningshbase-common.html
Findbugs warnings: 
https://builds.apache.org/job/PreCommit-HBASE-Build/8303//artifact/trunk/patchprocess/newPatchFindbugsWarningshbase-protocol.html
Findbugs warnings: 
https://builds.apache.org/job/PreCommit-HBASE-Build/8303//artifact/trunk/patchprocess/newPatchFindbugsWarningshbase-server.html
Findbugs warnings: 
https://builds.apache.org/job/PreCommit-HBASE-Build/8303//artifact/trunk/patchprocess/newPatchFindbugsWarningshbase-examples.html
Findbugs warnings: 
https://builds.apache.org/job/PreCommit-HBASE-Build/8303//artifact/trunk/patchprocess/newPatchFindbugsWarningshbase-thrift.html
Findbugs warnings: 
https://builds.apache.org/job/PreCommit-HBASE-Build/8303//artifact/trunk/patchprocess/newPatchFindbugsWarningshbase-hadoop-compat.html
Console output: 
https://builds.apache.org/job/PreCommit-HBASE-Build/8303//console

This message is automatically generated.

> Don't write back to WAL/memstore when Increment amount is zero (mostly for 
> query rather than update intention)
> --------------------------------------------------------------------------------------------------------------
>
>                 Key: HBASE-10252
>                 URL: https://issues.apache.org/jira/browse/HBASE-10252
>             Project: HBase
>          Issue Type: Improvement
>          Components: regionserver
>            Reporter: Feng Honghua
>            Assignee: Feng Honghua
>         Attachments: HBASE-10252-trunk-v0.patch, HBASE-10252-trunk-v1.patch
>
>
> When user calls Increment by providing amount=0, we don't write the original 
> value to WAL or memstore : adding 0 yields a 'new' value just with the same 
> value as the original one.
> 1. user provides 0 amount for query rather than for update, this fix is ok; 
> this intention is the most possible case;
> 2. user provides 0 amount for an update, this fix is also ok : no need to 
> touch back-end value if that value isn't changed;
> 3. either case we both return correct value, and keep subsequent query 
> results correct : if the 0 amount Increment is the first update, the query is 
> the same for retrieving a 0 value or retrieving nothing;



--
This message was sent by Atlassian JIRA
(v6.1.5#6160)

Reply via email to