[
https://issues.apache.org/jira/browse/HBASE-11172?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Ted Yu updated HBASE-11172:
---------------------------
Summary: Cancel a backup process (was: Cancal a backup process )
> Cancel a backup process
> ------------------------
>
> Key: HBASE-11172
> URL: https://issues.apache.org/jira/browse/HBASE-11172
> Project: HBase
> Issue Type: New Feature
> Affects Versions: 0.99.0
> Reporter: Demai Ni
> Fix For: 0.99.0
>
>
> h2. Feature Description
> the jira is part of
> [HBASE-7912|https://issues.apache.org/jira/browse/HBASE-7912], and depend on
> full backup [HBASE-10900| https://issues.apache.org/jira/browse/HBASE-10900]
> and incremental backup [HBASE-11085|
> https://issues.apache.org/jira/browse/HBASE-11085]. for the detail layout and
> frame work, please reference to [HBASE-10900|
> https://issues.apache.org/jira/browse/HBASE-10900].
> A backup operation may need to move handreds/thousands GB of data, and takes
> hours. Sometimes, the operation may take longer than the original maintenance
> time window planned by the administration. So it is necessary to have the
> functionality to cancel the operation and reset all the history/manifest info
> whenever necessary. so that we can have a clean backup in the next time
> window
--
This message was sent by Atlassian JIRA
(v6.2#6252)