[ 
https://issues.apache.org/jira/browse/HBASE-11172?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Ted Yu updated HBASE-11172:
---------------------------

    Summary: Cancel a backup process   (was: Cancal a backup process )

> Cancel a backup process 
> ------------------------
>
>                 Key: HBASE-11172
>                 URL: https://issues.apache.org/jira/browse/HBASE-11172
>             Project: HBase
>          Issue Type: New Feature
>    Affects Versions: 0.99.0
>            Reporter: Demai Ni
>             Fix For: 0.99.0
>
>
> h2. Feature Description
> the jira is part of  
> [HBASE-7912|https://issues.apache.org/jira/browse/HBASE-7912], and depend on 
> full backup [HBASE-10900| https://issues.apache.org/jira/browse/HBASE-10900] 
> and incremental backup [HBASE-11085| 
> https://issues.apache.org/jira/browse/HBASE-11085]. for the detail layout and 
> frame work, please reference to  [HBASE-10900|  
> https://issues.apache.org/jira/browse/HBASE-10900].
> A backup operation may need to move handreds/thousands GB of data, and takes 
> hours. Sometimes, the operation may take longer than the original maintenance 
> time window planned by the administration. So it is necessary to have the 
> functionality to cancel the operation and reset all the history/manifest info 
> whenever necessary. so that we can have a clean backup in the next time 
> window 



--
This message was sent by Atlassian JIRA
(v6.2#6252)

Reply via email to