[
https://issues.apache.org/jira/browse/HBASE-5826?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14079813#comment-14079813
]
Hadoop QA commented on HBASE-5826:
----------------------------------
{color:red}-1 overall{color}. Here are the results of testing the latest
attachment
http://issues.apache.org/jira/secure/attachment/12542625/5826-v5.txt
against trunk revision .
ATTACHMENT ID: 12542625
{color:green}+1 @author{color}. The patch does not contain any @author
tags.
{color:green}+1 tests included{color}. The patch appears to include 3 new
or modified tests.
{color:red}-1 patch{color}. The patch command could not apply the patch.
Console output:
https://builds.apache.org/job/PreCommit-HBASE-Build/10228//console
This message is automatically generated.
> Improve sync of HLog edits
> --------------------------
>
> Key: HBASE-5826
> URL: https://issues.apache.org/jira/browse/HBASE-5826
> Project: HBase
> Issue Type: Improvement
> Components: wal
> Reporter: Ted Yu
> Assignee: Todd Lipcon
> Attachments: 5826-v2.txt, 5826-v3.txt, 5826-v4.txt, 5826-v5.txt,
> 5826.txt
>
>
> HBASE-5782 solved the correctness issue for the sync of HLog edits.
> Todd provided a patch that would achieve higher throughput.
> This JIRA is a continuation of Todd's work submitted there.
--
This message was sent by Atlassian JIRA
(v6.2#6252)