[ 
https://issues.apache.org/jira/browse/HBASE-11164?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

stack updated HBASE-11164:
--------------------------
    Assignee: stack

> Document and test rolling updates from 0.98 -> 1.0
> --------------------------------------------------
>
>                 Key: HBASE-11164
>                 URL: https://issues.apache.org/jira/browse/HBASE-11164
>             Project: HBase
>          Issue Type: Sub-task
>            Reporter: Enis Soztutar
>            Assignee: stack
>            Priority: Critical
>             Fix For: 0.99.2
>
>
> I think 1.0 should be rolling upgradable from 0.98 unless we break it 
> intentionally for a specific reason. Unless there is such an issue, lets 
> document that 1.0 and 0.98 should be rolling upgrade compatible. 
> We should also test this before the 0.99 release. 



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to