[ 
https://issues.apache.org/jira/browse/HBASE-12549?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14221818#comment-14221818
 ] 

stack commented on HBASE-12549:
-------------------------------

Thank you for the addendum [~virag] That fixed broke branch-1.  You the man.  
Applied to branch-1.

I tried 0.98 and it doesn't seem to have this issue.

> Fix TestAssignmentManagerOnCluster#testAssignRacingWithSSH() flaky test
> -----------------------------------------------------------------------
>
>                 Key: HBASE-12549
>                 URL: https://issues.apache.org/jira/browse/HBASE-12549
>             Project: HBase
>          Issue Type: Test
>            Reporter: Enis Soztutar
>            Assignee: Enis Soztutar
>             Fix For: 2.0.0, 0.98.9, 0.99.2
>
>         Attachments: HBASE-12459-addendum.patch, hbase-12549_v1.patch
>
>
> TestAssignmentManagerOnCluster#testAssignRacingWithSSH() runs on average 40 
> sec, with 60 sec timeout. This causes flakiness. 
> The fix is easy. One of the earlier tests increases the 
> hbase.assignment.maximum.attempts from 3 to 10. Then 
> testAssignRacingWithSSH() is ran with 10 attempts causing slowness. 



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to