[
https://issues.apache.org/jira/browse/HBASE-12782?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14270196#comment-14270196
]
stack edited comment on HBASE-12782 at 1/9/15 4:44 AM:
-------------------------------------------------------
Fourth run failed at 125M on 0.98 so 50% failure rate.
was (Author: stack):
Forth run failed at 125M on 0.98 so 50% failure rate.
> ITBLL fails for me if generator does anything but 5M per maptask
> ----------------------------------------------------------------
>
> Key: HBASE-12782
> URL: https://issues.apache.org/jira/browse/HBASE-12782
> Project: HBase
> Issue Type: Bug
> Components: integration tests
> Affects Versions: 1.0.0
> Reporter: stack
> Priority: Critical
> Fix For: 1.0.0
>
>
> Anyone else seeing this? If I do an ITBLL with generator doing 5M rows per
> maptask, all is good -- verify passes. I've been running 5 servers and had
> one splot per server. So below works:
> HADOOP_CLASSPATH="/home/stack/conf_hbase:`/home/stack/hbase/bin/hbase
> classpath`" ./hadoop/bin/hadoop --config ~/conf_hadoop
> org.apache.hadoop.hbase.test.IntegrationTestBigLinkedList --monkey
> serverKilling Generator 5 5000000 g1.tmp
> or if I double the map tasks, it works:
> HADOOP_CLASSPATH="/home/stack/conf_hbase:`/home/stack/hbase/bin/hbase
> classpath`" ./hadoop/bin/hadoop --config ~/conf_hadoop
> org.apache.hadoop.hbase.test.IntegrationTestBigLinkedList --monkey
> serverKilling Generator 10 5000000 g2.tmp
> ...but if I change the 5M to 50M or 25M, Verify fails.
> Looking into it.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)