[
https://issues.apache.org/jira/browse/HBASE-13007?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14315470#comment-14315470
]
Hadoop QA commented on HBASE-13007:
-----------------------------------
{color:red}-1 overall{color}. Here are the results of testing the latest
attachment
http://issues.apache.org/jira/secure/attachment/12697902/HBASE-13007-v1.patch
against master branch at commit a7d93155f10184942ffc146f0694e5da83c78cd4.
ATTACHMENT ID: 12697902
{color:green}+1 @author{color}. The patch does not contain any @author
tags.
{color:green}+1 tests included{color}. The patch appears to include 4 new
or modified tests.
{color:green}+1 javac{color}. The applied patch does not increase the
total number of javac compiler warnings.
{color:green}+1 javac{color}. The applied patch does not increase the
total number of javac compiler warnings.
{color:green}+1 javadoc{color}. The javadoc tool did not generate any
warning messages.
{color:green}+1 checkstyle{color}. The applied patch does not increase the
total number of checkstyle errors
{color:green}+1 findbugs{color}. The patch does not introduce any new
Findbugs (version 2.0.3) warnings.
{color:green}+1 release audit{color}. The applied patch does not increase
the total number of release audit warnings.
{color:green}+1 lineLengths{color}. The patch does not introduce lines
longer than 100
{color:green}+1 site{color}. The mvn site goal succeeds with this patch.
{color:red}-1 core tests{color}. The patch failed these unit tests:
org.apache.hadoop.hbase.mapreduce.TestLoadIncrementalHFiles
org.apache.hadoop.hbase.master.TestDistributedLogSplitting
{color:red}-1 core zombie tests{color}. There are 1 zombie test(s):
at
org.apache.hadoop.hbase.coprocessor.TestMasterObserver.testRegionTransitionOperations(TestMasterObserver.java:1604)
Test results:
https://builds.apache.org/job/PreCommit-HBASE-Build/12769//testReport/
Findbugs warnings:
https://builds.apache.org/job/PreCommit-HBASE-Build/12769//artifact/patchprocess/newPatchFindbugsWarningshbase-protocol.html
Findbugs warnings:
https://builds.apache.org/job/PreCommit-HBASE-Build/12769//artifact/patchprocess/newPatchFindbugsWarningshbase-hadoop-compat.html
Findbugs warnings:
https://builds.apache.org/job/PreCommit-HBASE-Build/12769//artifact/patchprocess/newPatchFindbugsWarningshbase-thrift.html
Findbugs warnings:
https://builds.apache.org/job/PreCommit-HBASE-Build/12769//artifact/patchprocess/newPatchFindbugsWarningshbase-server.html
Findbugs warnings:
https://builds.apache.org/job/PreCommit-HBASE-Build/12769//artifact/patchprocess/newPatchFindbugsWarningshbase-common.html
Findbugs warnings:
https://builds.apache.org/job/PreCommit-HBASE-Build/12769//artifact/patchprocess/newPatchFindbugsWarningshbase-hadoop2-compat.html
Findbugs warnings:
https://builds.apache.org/job/PreCommit-HBASE-Build/12769//artifact/patchprocess/newPatchFindbugsWarningshbase-rest.html
Findbugs warnings:
https://builds.apache.org/job/PreCommit-HBASE-Build/12769//artifact/patchprocess/newPatchFindbugsWarningshbase-examples.html
Findbugs warnings:
https://builds.apache.org/job/PreCommit-HBASE-Build/12769//artifact/patchprocess/newPatchFindbugsWarningshbase-client.html
Findbugs warnings:
https://builds.apache.org/job/PreCommit-HBASE-Build/12769//artifact/patchprocess/newPatchFindbugsWarningshbase-prefix-tree.html
Findbugs warnings:
https://builds.apache.org/job/PreCommit-HBASE-Build/12769//artifact/patchprocess/newPatchFindbugsWarningshbase-annotations.html
Checkstyle Errors:
https://builds.apache.org/job/PreCommit-HBASE-Build/12769//artifact/patchprocess/checkstyle-aggregate.html
Console output:
https://builds.apache.org/job/PreCommit-HBASE-Build/12769//console
This message is automatically generated.
> Fix the test timeouts being caused by ChoreService
> ---------------------------------------------------
>
> Key: HBASE-13007
> URL: https://issues.apache.org/jira/browse/HBASE-13007
> Project: HBase
> Issue Type: Bug
> Reporter: Jonathan Lawlor
> Assignee: Jonathan Lawlor
> Attachments: HBASE-13007-v1.patch
>
>
> TestChoreService has been seen timing out in recent builds and the timeouts
> seem to be rooted in how the ChoreService cancels its chores when being
> shutdown. The issue is that during shutdown, the ChoreService calls
> synchronized methods on the ScheduledChore which could cause indefinite
> blocking if the scheduled chore is hanging in a synchronized method. We
> should instead call the appropriate cancel method within the ChoreService and
> add logic into ScheduledChores that allows them to realize when they have
> been cancelled.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)