stack created HBASE-13161:
-----------------------------
Summary: ITBLL needs love; verify spins w/o end at 10B rows
Key: HBASE-13161
URL: https://issues.apache.org/jira/browse/HBASE-13161
Project: HBase
Issue Type: Bug
Components: integration tests
Reporter: stack
Making a note of my recent experience with ITBLL; here is stuff that needs
fixing.
+ I was able to run generate for about 24 hours with monkey going and loaded
10B rows. When I ran the verify (a few times), it got stuck at about 90odd
percent and never made progress beyond that (this was about 20 hours in IIRC).
I spent no time trying to figure why (ran out of cluster and time).
+ Verify at least takes too long. Need to make it run faster.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)