stack created HBASE-13161:
-----------------------------

             Summary: ITBLL needs love; verify spins w/o end at 10B rows
                 Key: HBASE-13161
                 URL: https://issues.apache.org/jira/browse/HBASE-13161
             Project: HBase
          Issue Type: Bug
          Components: integration tests
            Reporter: stack


Making a note of my recent experience with ITBLL; here is stuff that needs 
fixing.

+ I was able to run generate for about 24 hours with monkey going and loaded 
10B rows. When I ran the verify (a few times), it got stuck at about 90odd 
percent and never made progress beyond that (this was about 20 hours in IIRC). 
I spent no time trying to figure why (ran out of cluster and time).
+ Verify at least takes too long. Need to make it run faster.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to