[
https://issues.apache.org/jira/browse/HBASE-13575?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
stack updated HBASE-13575:
--------------------------
Resolution: Fixed
Fix Version/s: 1.1.0
2.0.0
Hadoop Flags: Reviewed
Status: Resolved (was: Patch Available)
Pushed to master, branch-1, and branch-1.1 ([~ndimiduk]). Patch was +1'd by
[~jonathan.lawlor] on rb and I skimmed... looks good. Thanks for the patch
[~syuanjiang]
> TestChoreService has to make sure that the opened ChoreService is closed for
> each unit test
> -------------------------------------------------------------------------------------------
>
> Key: HBASE-13575
> URL: https://issues.apache.org/jira/browse/HBASE-13575
> Project: HBase
> Issue Type: Bug
> Affects Versions: 2.0.0, 1.1.0, 1.2.0
> Reporter: Stephen Yuan Jiang
> Assignee: Stephen Yuan Jiang
> Priority: Trivial
> Labels: beginner
> Fix For: 2.0.0, 1.1.0
>
> Attachments: HBASE-13575.v1-master.patch
>
>
> The TestChoreService shut down the opened ChoreService after each individual
> unit test. This is to avoid test failure with enormous amount of active
> threads at the end of test on slow virtual host (see HBASE-12992). However,
> the service shut down was not wrapped around the 'finally'-block to guarantee
> the execution when exception throws. The fix is trial.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)