[
https://issues.apache.org/jira/browse/HBASE-13877?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Enis Soztutar updated HBASE-13877:
----------------------------------
Attachment: hbase-13877_v2-to-v4-branch-1.1.patch
v4 test should fix the UT.
bq. When YARN dumps result, this nice addition gets cut off. How you looking at
it Enis Soztutar?
Yarn 2.7.1 fails the tasks if task emits more than 120 counters. If that
happens, the job does not show any counters at all at the end. I thought we
would still want the job to go through. Should I revert this part?
> Interrupt to flush from TableFlushProcedure causes dataloss in ITBLL
> --------------------------------------------------------------------
>
> Key: HBASE-13877
> URL: https://issues.apache.org/jira/browse/HBASE-13877
> Project: HBase
> Issue Type: Bug
> Reporter: Enis Soztutar
> Assignee: Enis Soztutar
> Priority: Blocker
> Fix For: 2.0.0, 1.2.0, 1.1.1
>
> Attachments: hbase-13877_v1.patch, hbase-13877_v2-branch-1.1.patch,
> hbase-13877_v2-to-v4-branch-1.1.patch, hbase-13877_v3-branch-1.1.patch
>
>
> ITBLL with 1.25B rows failed for me (and Stack as reported in
> https://issues.apache.org/jira/browse/HBASE-13811?focusedCommentId=14577834&page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel#comment-14577834)
>
> HBASE-13811 and HBASE-13853 fixed an issue with WAL edit filtering.
> The root cause this time seems to be different. It is due to procedure based
> flush interrupting the flush request in case the procedure is cancelled from
> an exception elsewhere. This leaves the memstore snapshot intact without
> aborting the server. The next flush, then flushes the previous memstore with
> the current seqId (as opposed to seqId from the memstore snapshot). This
> creates an hfile with larger seqId than what its contents are. Previous
> behavior in 0.98 and 1.0 (I believe) is that after flush prepare and
> interruption / exception will cause RS abort.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)