[
https://issues.apache.org/jira/browse/HBASE-13161?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14707728#comment-14707728
]
stack commented on HBASE-13161:
-------------------------------
I got to 8.5B w/ slow deterministic and verify passed. Will resolve when I get
to 10B.
> ITBLL needs love; verify spins w/o end at 10B rows
> --------------------------------------------------
>
> Key: HBASE-13161
> URL: https://issues.apache.org/jira/browse/HBASE-13161
> Project: HBase
> Issue Type: Bug
> Components: integration tests
> Reporter: stack
>
> Making a note of my recent experience with ITBLL; here is stuff that needs
> fixing.
> + I was able to run generate for about 24 hours with monkey going and loaded
> 10B rows. When I ran the verify (a few times), it got stuck at about 90odd
> percent and never made progress beyond that (this was about 20 hours in
> IIRC). I spent no time trying to figure why (ran out of cluster and time).
> + Verify at least takes too long. Need to make it run faster.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)