https://issues.apache.org/jira/browse/HBASE-14648?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14971487#comment-14971487
 ] 

stack commented on HBASE-14648:
-------------------------------

bq. If the dn restart slowly, but store insert fast enough, all dn will be 
connected failed....

We've seen this in test failures.

To me, the test is about procedure keeping on working across a restart of a DN 
so I think it fine setting min down in the test to 1 as you suggest (patch does 
not seem to do this). As you point out, the write will fail if min requires 3 
DNs across a restart.

> Reenable TestWALProcedureStoreOnHDFS#testWalRollOnLowReplication
> ----------------------------------------------------------------
>
>                 Key: HBASE-14648
>                 URL: https://issues.apache.org/jira/browse/HBASE-14648
>             Project: HBase
>          Issue Type: Sub-task
>          Components: test
>            Reporter: stack
>            Priority: Critical
>             Fix For: 2.0.0, 1.2.0, 1.3.0, 1.1.3
>
>         Attachments: HBASE-14648.patch, HBASE-14648.patch
>
>




--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to