[ 
https://issues.apache.org/jira/browse/HBASE-14712?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Matteo Bertozzi updated HBASE-14712:
------------------------------------
    Attachment: HBASE-14712-v1.patch

v1 is a more extensive fix. has the v0 periodic cleanup + some fix to the 
tracker. This should do the trick under normal behavior.
there are other things as TODO since the first patch, that will always maintain 
a low and short number of wals, but i'm going to do that later in another 
jiras.  

> MasterProcWALs never clean up
> -----------------------------
>
>                 Key: HBASE-14712
>                 URL: https://issues.apache.org/jira/browse/HBASE-14712
>             Project: HBase
>          Issue Type: Bug
>            Reporter: Elliott Clark
>            Assignee: Matteo Bertozzi
>            Priority: Blocker
>             Fix For: 2.0.0, 1.2.0, 1.3.0, 1.1.3
>
>         Attachments: HBASE-14712-v0.patch, HBASE-14712-v1.patch, state.tar.gz
>
>
> MasterProcWALs directory grows pretty much un-bounded. Because of that when 
> master failover happens the NN is flooded with connections and everything 
> grinds to a halt.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to