[ https://issues.apache.org/jira/browse/HBASE-15082?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=15092821#comment-15092821 ]
Elliott Clark commented on HBASE-15082: --------------------------------------- I think we should just get this in when it's ready to land. It it lands before 1.2 is ready then I feel we can get it in without making 1.2 too delayed. Still reading the code to try and make sure that everything else looks good. > Fix merge of MVCC and SequenceID performance regression > ------------------------------------------------------- > > Key: HBASE-15082 > URL: https://issues.apache.org/jira/browse/HBASE-15082 > Project: HBase > Issue Type: Sub-task > Components: Performance > Reporter: stack > Assignee: stack > Priority: Critical > Fix For: 2.0.0, 1.2.0, 1.3.0 > > Attachments: 15082.patch, 15082v2.patch, 15082v2.txt, 15082v3.txt, > 15082v4.patch, 15082v5.patch, 15082v6.patch, 15082v7.patch > > > This is general fix for increments (appends, checkAnd*) perf-regression > identified in the parent issue. HBASE-15031 has a narrow fix for branch-1.1 > and branch-1.0. -- This message was sent by Atlassian JIRA (v6.3.4#6332)