[ 
https://issues.apache.org/jira/browse/HBASE-15100?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Enis Soztutar updated HBASE-15100:
----------------------------------
    Attachment: procs.log

[~mbertozzi] attaching some relevant logs from my test cluster that seems 
related to this issue. 

I had branch-1 code running for some time which seems that it left over some 
~300 proc wals left uncleaned. When I restarted with 1.1.3 bits on the same 
data, master decided to delete these proc wals. 

> Master WALProcs still never clean up
> ------------------------------------
>
>                 Key: HBASE-15100
>                 URL: https://issues.apache.org/jira/browse/HBASE-15100
>             Project: HBase
>          Issue Type: Bug
>          Components: master, proc-v2
>    Affects Versions: 1.2.0
>            Reporter: Elliott Clark
>            Assignee: Matteo Bertozzi
>            Priority: Blocker
>         Attachments: HBASE-15100-v0.patch, TestWalProcedure.java, procs.log
>
>
> {code}
> bin/hdfs dfs -ls /hbase/MasterProcWALs | wc -l
> 218631
> {code}



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to