[ 
https://issues.apache.org/jira/browse/HBASE-15196?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=15128379#comment-15128379
 ] 

stack edited comment on HBASE-15196 at 2/2/16 3:11 PM:
-------------------------------------------------------

Can I have a review please? Just adding a few tests that later code, the last 
part of this big patch needs. Thanks.

The timed out test is unrelated. Passes for 1.7. Let me retry in the meantime 
while waiting on review.


was (Author: stack):
Can I have a review please? Just adding a few tests that later code, the last 
part of this big patch needs. Thanks.

The timed out test is unrelated. Let me retry in the meantime.

> HBASE-15158 Preamble 2 of 2:Add Increment tests
> -----------------------------------------------
>
>                 Key: HBASE-15196
>                 URL: https://issues.apache.org/jira/browse/HBASE-15196
>             Project: HBase
>          Issue Type: Bug
>            Reporter: stack
>            Assignee: stack
>         Attachments: 15196.patch, 15196v2.patch, 15196v3.patch, 15196v3.patch
>
>
> Add the tests that were added by parent issue HBASE-15158; adds 
> IncrementPerformanceTest, TestRegionIncrement, and moves Increment testing 
> 'from client side' out into own test suite. This stuff is mostly forward-post 
> of tests  committed to branch-1 to test increment regressions 'narorow' fix 
> (See HBASE-15031). We are adding the tests separately here in an effort at 
> making the HBASE-15158 patch smaller. This is preamble 2 of 2. Preamble 1 was 
> HBASE-15186



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to