[ 
https://issues.apache.org/jira/browse/HBASE-15566?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

stack resolved HBASE-15566.
---------------------------
       Resolution: Fixed
         Assignee: stack
    Fix Version/s: 2.0.0

Pushed to master

> Add timeouts on TestMobFlushSnapshotFromClient and 
> TestRegionMergeTransactionOnCluster
> --------------------------------------------------------------------------------------
>
>                 Key: HBASE-15566
>                 URL: https://issues.apache.org/jira/browse/HBASE-15566
>             Project: HBase
>          Issue Type: Bug
>            Reporter: stack
>            Assignee: stack
>             Fix For: 2.0.0
>
>         Attachments: timeouts.patch
>
>
> Looking at recent timeouts, these two tests are missing timeout or the 
> timeouts are not fit for their category.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to